The construction of Kenyir Dam spanned 15 years, from the planning stage to its completion. Initially identified in 1961, the project was deemed uneconomic due to low demand and high production costs. However, in the early 1970s, the government revived the study and proceeded with further site investigations, eventually leading to the successful construction of the dam.
Although the original survey for the Kenyir Dam project was conducted in 1972, construction began in 1978 and was completed in 1985. The entire project was officially opened in 1987 by His Royal Highness The Sultan of Terengganu Darul Iman and named the “Sultan Mahmud Hydro Electric Power Station” in honor of the Sultan.
The Kenyir Hydro Electric Project, located at Kuala Kenyir approximately 55km from Kuala Terengganu, features a rock fill dam and a generating plant with a capacity of 400 megawatts. During its construction, two temporary diversion tunnels were created to redirect the rivers.
The lake’s normal storage capacity is 13.6 billion cubic meters, with its deepest point reaching 145 meters. The power station complex can produce 100 MW per unit, contributing to Malaysia’s national power grid. Its daily operations maintain a continuous power output of 165 MW, with an average annual output of 1600 GWh (Giga watt hours).